BASIC DATA ON THREE PROJECTS
- 6MW – Kherson Region
For this project, we have the following documentation available:
-Technical Conditions
– Grid Agreement Connection
-Land Rent Agreement
-Land Category is 14.01 (for electricity production from RES)
-General Plan of territory
-pre-PPA
-PvSyst Report
-Geology and Topography reports
-SPP Project documentation
-Project Timeline (approx)
-Construction permit
-Financial model based on (EPC by Solar Steel Construction, PV Modules Zhnshine
370W, Inverters Solaris 60kW/100kW, Mounting systems by Solar Steel Construction)
-Established SPV
-Terms and Conditions of the project are up for discussion
- 2.5MW – Cherkasy Region
For this project, we have the following documentation available:
-Technical Conditions
– Grid Agreement Connection
– Land Rent Agreement
– Land Value Calculation
– Land Category is 14.01 (for electricity production from RES)
-PvSyst Report
-Geology, Geodesic and Topography Reports
-Land Plot photos
-Detailed Plan
-Financial model based on (EPC by Solar Steel Construction/Cetus, PV Modules Zhnshine
370W, Inverters Solaris 60kW/100kW, Mounting systems by Solar Steel Construction)
-Established SPV
-SPP Design is in the finalization stage
-Construction permit is in progress
-Terms and Conditions of the project are up for discussion
- 9MW – Khmelnitsky Region
For this project, we have the following documentation available:
-Technical Conditions
– Grid Agreement Connection
-Land Rent Agreement
-Land Value Calculation
– Land Category is 14.01 (for electricity production from RES)
-Geodesic and Topography Reports
-Detailed Plan
-Established SPV
-SPP Design is in progress
-Construction permit in progress
-Terms and Conditions of the project are up for discussion